Ta Vaeng Copper and Gold Project
Cambodia
- Unity exploration licence application (area 199km²) - Unity 85% ownership
- Situated in MOE protected area (Virechy National Park)
- Large altered volcanic package (massive, vuggy & granular silica with pyrophyllite-dickite-diaspore-andalusite-topaz) an interpreted lithocap
- 7km x 5km vegetation anomaly believed to be due to hydrothermal alteration above intrusive system
- Sulphur-rich springs
- Recorded molybdenum occurrence
- The scale of the system and the intensity of the alteration suggest potential for sizable mineral deposit (Unity is targeting copper-gold)
- No drilling has ever been conducted
- IESIA study completed & Inter-Ministerial Meeting approval received on 17 August 2023. Waiting final approval by Ministry of Environment